ECI worked with Leighton Contractors, Q Electrical and Triple M Mechanical Services to design, construct, install and commission a tri-generation system on Level 56 of 111 Eagle St, on the river in the heart of the Brisbane CBD.

ECI engineered, designed, manufactured, installed and commissioned a full turnkey Tri-generation flue system to meet the building’s architectural design requirements as well as stringent Brisbane City Council air policy regulations.

Download factsheet

Project Scope

  • SCR
  • Tri-generation
  • Silencers and exhaust system (gas and diesel)
  • Boiler exhaust system
  • Plant room installation
  • Emissions control (oxidation catalyst)